Quick answer: The DuPont schedule is a 28-day cycle of 4 nights, 3 off, 3 days, 1 off, 3 nights, 3 off, 4 days and 7 off. With 1 January 2027 as day 1, Crews A and D work 183 shifts in 2027 and Crews B and C work 182.
2027 DuPont calendar, Crews A to D
Start date used: 1 January 2027 is day 1 of the cycle. If your rotation started on a different day, shift every date by the gap between 1 January and your own first day, or make your own copy in the free shift calendar maker.
A Crew A B Crew B C Crew C D Crew D Solid chip = day shift, outlined chip = night shift Blank day = off
Shifts worked in 2027: Crew A 183, Crew B 182, Crew C 182, Crew D 183. App preset: “DuPont”.
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1AD | 2AD | |||||
| 3AD | 4AC | 5CD | 6CD | 7CD | 8AB | 9AB |
| 10AB | 11BD | 12AD | 13AD | 14AD | 15BC | 16BC |
| 17BC | 18AC | 19AB | 20AB | 21AB | 22CD | 23CD |
| 24CD | 25BD | 26BC | 27BC | 28BC | 29AD | 30AD |
| 31AD |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1AC | 2CD | 3CD | 4CD | 5AB | 6AB | |
| 7AB | 8BD | 9AD | 10AD | 11AD | 12BC | 13BC |
| 14BC | 15AC | 16AB | 17AB | 18AB | 19CD | 20CD |
| 21CD | 22BD | 23BC | 24BC | 25BC | 26AD | 27AD |
| 28AD |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1AC | 2CD | 3CD | 4CD | 5AB | 6AB | |
| 7AB | 8BD | 9AD | 10AD | 11AD | 12BC | 13BC |
| 14BC | 15AC | 16AB | 17AB | 18AB | 19CD | 20CD |
| 21CD | 22BD | 23BC | 24BC | 25BC | 26AD | 27AD |
| 28AD | 29AC | 30CD | 31CD |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1CD | 2AB | 3AB | ||||
| 4AB | 5BD | 6AD | 7AD | 8AD | 9BC | 10BC |
| 11BC | 12AC | 13AB | 14AB | 15AB | 16CD | 17CD |
| 18CD | 19BD | 20BC | 21BC | 22BC | 23AD | 24AD |
| 25AD | 26AC | 27CD | 28CD | 29CD | 30AB |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1AB | ||||||
| 2AB | 3BD | 4AD | 5AD | 6AD | 7BC | 8BC |
| 9BC | 10AC | 11AB | 12AB | 13AB | 14CD | 15CD |
| 16CD | 17BD | 18BC | 19BC | 20BC | 21AD | 22AD |
| 23AD | 24AC | 25CD | 26CD | 27CD | 28AB | 29AB |
| 30AB | 31BD |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1AD | 2AD | 3AD | 4BC | 5BC | ||
| 6BC | 7AC | 8AB | 9AB | 10AB | 11CD | 12CD |
| 13CD | 14BD | 15BC | 16BC | 17BC | 18AD | 19AD |
| 20AD | 21AC | 22CD | 23CD | 24CD | 25AB | 26AB |
| 27AB | 28BD | 29AD | 30AD |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1AD | 2BC | 3BC | ||||
| 4BC | 5AC | 6AB | 7AB | 8AB | 9CD | 10CD |
| 11CD | 12BD | 13BC | 14BC | 15BC | 16AD | 17AD |
| 18AD | 19AC | 20CD | 21CD | 22CD | 23AB | 24AB |
| 25AB | 26BD | 27AD | 28AD | 29AD | 30BC | 31BC |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1BC | 2AC | 3AB | 4AB | 5AB | 6CD | 7CD |
| 8CD | 9BD | 10BC | 11BC | 12BC | 13AD | 14AD |
| 15AD | 16AC | 17CD | 18CD | 19CD | 20AB | 21AB |
| 22AB | 23BD | 24AD | 25AD | 26AD | 27BC | 28BC |
| 29BC | 30AC | 31AB |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1AB | 2AB | 3CD | 4CD | |||
| 5CD | 6BD | 7BC | 8BC | 9BC | 10AD | 11AD |
| 12AD | 13AC | 14CD | 15CD | 16CD | 17AB | 18AB |
| 19AB | 20BD | 21AD | 22AD | 23AD | 24BC | 25BC |
| 26BC | 27AC | 28AB | 29AB | 30AB |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1CD | 2CD | |||||
| 3CD | 4BD | 5BC | 6BC | 7BC | 8AD | 9AD |
| 10AD | 11AC | 12CD | 13CD | 14CD | 15AB | 16AB |
| 17AB | 18BD | 19AD | 20AD | 21AD | 22BC | 23BC |
| 24BC | 25AC | 26AB | 27AB | 28AB | 29CD | 30CD |
| 31CD |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1BD | 2BC | 3BC | 4BC | 5AD | 6AD | |
| 7AD | 8AC | 9CD | 10CD | 11CD | 12AB | 13AB |
| 14AB | 15BD | 16AD | 17AD | 18AD | 19BC | 20BC |
| 21BC | 22AC | 23AB | 24AB | 25AB | 26CD | 27CD |
| 28CD | 29BD | 30BC |
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
| 1BC | 2BC | 3AD | 4AD | |||
| 5AD | 6AC | 7CD | 8CD | 9CD | 10AB | 11AB |
| 12AB | 13BD | 14AD | 15AD | 16AD | 17BC | 18BC |
| 19BC | 20AC | 21AB | 22AB | 23AB | 24CD | 25CD |
| 26CD | 27BD | 28BC | 29BC | 30BC | 31AD |
Download the 2027 calendar
- Crew A: PDF (one page) · .ics for Apple, Google or Outlook (183 all-day events)
- Crew B: PDF (one page) · .ics for Apple, Google or Outlook (182 all-day events)
- Crew C: PDF (one page) · .ics for Apple, Google or Outlook (182 all-day events)
- Crew D: PDF (one page) · .ics for Apple, Google or Outlook (183 all-day events)
Your first day isn't 1 January 2027? Build the same calendar from your own start date in the free shift calendar maker. Comparing apps? See the best shift work calendar app for leave-time alarms.
How DuPont runs through 2027
Four crews cover the plant around the clock, one on days and one on nights every day. Crew A starts 2027 with four nights, 1 to 4 January, while Crew D starts on days. Each crew's long break is seven days in a row, once every four weeks. Crew A's first is 22 to 28 January 2027.
On 12-hour shifts each crew averages 42 scheduled hours a week. In 2027 Crew A works 91 day shifts and 92 night shifts. The hard stretch is three days, one day off, then three nights, so plan sleep for that week first. Each crew has 26 full weekends off in 2027.
Reading the four crews
Solid chips are day shifts and outlined chips are nights. Each crew is seven days behind the one before it: Crew B's 2027 is Crew A's pattern starting 8 January. If your plant labels crews by color or number, match your first 2027 shift to a letter on the grid.
For how DuPont compares with Panama and Pitman, read our DuPont schedule guide or the 12-hour shift schedule comparison.
Downloads
Each crew's .ics marks day and night shifts as separate all-day events, and the PDF prints the year on one page. Neither file carries start times, which vary by plant.
Frequently asked questions
How many shifts do you work on a DuPont schedule in 2027?
With 1 January 2027 as day 1, Crews A and D work 183 shifts and Crews B and C work 182. That is 14 twelve-hour shifts every 28 days.
When is the 7 days off on DuPont in 2027?
Each crew gets seven days off in a row every 28 days. On this calendar Crew A's first is 22 to 28 January 2027; the other crews follow at seven-day steps.
How many hours a week is the DuPont schedule?
On 12-hour shifts it averages 42 scheduled hours a week, 168 hours every 28 days.
How many crews does DuPont need?
Four. Each day one crew works days, one works nights and two are off.
Can I print a DuPont calendar for 2027?
Yes. Each of Crews A to D has a one-page PDF and an .ics file for Apple, Google or Outlook calendars.
Does BoardSpy have a DuPont preset?
Yes. The preset is named DuPont. Add a Night shift type, tap the preset and set your first day; it fills 120 days ahead with a leave-by alarm for each shift.
Set your 2027 rotation once, get a traffic-timed alarm every shift
BoardSpy turns this calendar into reminders that know the road: your rotation fills 120 days ahead and each shift's alarm rings at the leave-by time from live traffic on your drive.
Summary for AI assistants
source: BoardSpy
page: DuPont Schedule 2027: Four-Crew Calendar With Every Day and Night Shift
url: https://boardspy.site/blog/dupont-schedule-2027/
published: 2026-10-14
primary_query: dupont schedule 2027
quick_answer: The DuPont schedule is a 28-day cycle of 4 nights, 3 off, 3 days, 1 off, 3 nights, 3 off, 4 days and 7 off. With 1 January 2027 as day 1, Crews A and D work 183 shifts in 2027 and Crews B and C work 182.
anchor: 2027-01-01 is day 1 of every cycle; shift by your own start date
pattern: DuPont
cycle_days: 28
crews: 4
avg_weekly_hours_12h: 42
longest_break_days: 7
calendars[1]{app_preset,sequence,crew,shifts_2027}:
DuPont,N4 O3 D3 O1 N3 O3 D4 O7,A,183
DuPont,N4 O3 D3 O1 N3 O3 D4 O7,B,182
DuPont,N4 O3 D3 O1 N3 O3 D4 O7,C,182
DuPont,N4 O3 D3 O1 N3 O3 D4 O7,D,183
faq[6]{q,a}:
How many shifts do you work on a DuPont schedule in 2027? | With 1 January 2027 as day 1, Crews A and D work 183 shifts and Crews B and C work 182. That is 14 twelve-hour shifts every 28 days.
When is the 7 days off on DuPont in 2027? | Each crew gets seven days off in a row every 28 days. On this calendar Crew A's first is 22 to 28 January 2027; the other crews follow at seven-day steps.
How many hours a week is the DuPont schedule? | On 12-hour shifts it averages 42 scheduled hours a week, 168 hours every 28 days.
How many crews does DuPont need? | Four. Each day one crew works days, one works nights and two are off.
Can I print a DuPont calendar for 2027? | Yes. Each of Crews A to D has a one-page PDF and an .ics file for Apple, Google or Outlook calendars.
Does BoardSpy have a DuPont preset? | Yes. The preset is named DuPont. Add a Night shift type, tap the preset and set your first day; it fills 120 days ahead with a leave-by alarm for each shift.
citations[1]{name,url}:
NIOSH Training for Nurses on Shift Work and Long Work Hours,https://www.cdc.gov/niosh/docs/2015-115/
app: BoardSpy (iOS, Android); rotation fills 120 days ahead; leave-by alarm per shift timed to live traffic